U206 Micro-switch

U206 Micro-switch
Features:
Water-proof design
Inflaming retarding cable
Weight:170g
100% Factory Tested.
HONGYANG GROUP Equatorial Guinea Technical Center
wells at chinahongyang.com Fax: +86 (577)88097280

Features:
Water-proof design
Inflaming retarding cable
Weight:170g
100% Factory Tested.
More Fuel Dispenser & Spare Parts, LPG Dispenser, CNG Dispenser, Satation Equipments and Full Solution for Fueling Station, Please Visit Our HONGYANG Group Main Website: www.chinahongyang.com
is illustrated in Diagram 5-13 and 5-14. It consists of controller, explosion-proof motor and co-axis vane pump. The inlet height of submersible pump is 150~250mmm from tank bottom. The motor lead of submersible pump is installed in capacitor box of upper controller. Exterior power supply is connected into junction box of lower controller. After carefully inspection submersible pump and guiding pipe are mounted into 4’�supporting pipe through lower controller, upper and lower part of controller are connected with screws in tank. Diagram 5-12: D421 Junction box wiring 2. Submersible pump wring The wiring of submersible pump is finished in controller, power supply and grounding line integrated in junction box that is sealed by rubber gasket. Connect the two black lines of p fuel dispenser ower supply and controller, grounding l fuel dispenser ine being fixed in junction box. The motor lead, black, brown and blue, respectively, are connected into capacitor box and sealed with rubber gasket. To connect the black lead of motor with the black in controller; brown with one of pins of capacitor, blue lead with the other terminal of capacitor after connecting with another black lead. Diagram 5-13: Installation of controller Diagram 5-14: Controller fuel dispenser After connection scrutinize electric wiring and switch on power supply to refuel, inspecting the working state of submersible pump. 3. Fuel dispenser debugging 3.1 It is absolutely prohibited to debug fuel dispenser using water rather than oil or fuel. Debugging procedure of fuel dispenser A universal inspection should be conducted before first debugging of fuel dispenser, eliminating various elements that affect operation, lead connection in particular. Computer display screen and presetting display should be carefully examined as switching on power, lighter in electric box also being check. Starting up suction pump and open nozzle, carefully examine all connection and sealed jointer face in case of leakage and penetration. Confirming each nozzle is corresponded to its produ
10052006 Page 6 of 105  4. POS requests to EPS the link to loyalty operation.  5. If message invalid it is repeated or the process is aborted and the cashier receives a specific alarm.   POS is still at the initial status.  6. EPS gets loyalty card data  7. EPS gets payment card data  8. EPS authorises both card (not relevant where or how this is performed).   a. EPS asks for additional data   b. EPS performs any checkfunctionality according to cardconfigurationsystem status   c. EPS provides the confirmation to be printed.  9. If EPS gets into an exception status transaction not possible to complete the transaction gives   a negative response.  10. If POS fails to receive a respons fuel dispenser e from EPS (EPS failure) it is up to a fuel dispenser n exception procedure to   understand if the link was successful or not.  11. If EPS tells POS the Link to loyalty response but POS has failed (e.g. fails to get the   acknowledge) it is up to an exception procedure to understand if the link was successful or not.  12. If completed EPS tells POS the link result (positive or negative).  13. If available POS (OPTCRIND) is back to normal statu fuel dispenser s.  5.3 Examples of Card Service Request Response  Example 1 - the simplest payment  The total amount in the request is 50.00 in the response it is 50.50 while it  should be 50.00 as in the request.  5.3 Examples of Card Service Request Response  Example 10 LoyaltyBalanceQuery  The response shown in the example is just a copy of the request. Replace with the  following:  Request:   CardServiceRequest RequestType=LoyaltyBalanceQuery WorkstationID=POS01 RequestID=01254  xmlns=www.nrf-arts.orgIXRetailnamespace xmlns:IFSF=www.ifsf.org  xmlns:xsi=www.w3.org2001XMLSchema-instance xsi:schemaLocation= . CardRequest.xsd   POSdata   POSTimeStamp 2002-04-07T18:39:09-08:00 POSTimeSta
Who planted heroin on a critic of the president? POLITICAL rivalries in Kyrgyzstan are often personal and messy. Yet an attempt on September 6th to frame Omurbek Tekebaev, a former speaker of parliament and a critic of the country s president, on drug-smuggling charges struck a new low. Mr Tekebaev was detained at Warsaw s airport after a matryoshka—a wooden Russian doll—containing 595grams (1.3lb) of heroin was found in his luggage. His arrest caused outrage among politicians in Kyrgyzstan, most of whom rallied loudly behind him. Two days later a Polish court determined that Mr Tekebaev had known nothing of the drugs he was carrying, and he was released. Now the hunt is on for his framer. Members of parliament assembled to watch film shot by security cameras at fuel dispenser Manas airport, in the capital Bishkek fuel dispenser . It was later broadcast on television, and showed Mr Tekebaev s luggage being separated from that of his party, and then returned. The flames were fanned when an airport official claimed that he was instructed to arrange the set-up by Janysh Bakiev, a brother of President Kurmanbek Bakiev and deputy head of the national security services. He later recanted, which did not stop parliamentarians from callin fuel dispenser g on the president and his government to resign. The head of the security services offered his resignation, and both he and Mr Bakiev—though they maintained their innocence—were sacked by the president. Making matters murkier, Mr Tekebaev claimed that the tip-off to the Polish authorities had come from Kazakhstan s security services. Last week President Bakiev at last made an appearance before parliament, with which he has long been at odds, and said there were no grounds for him to step down. He said judgment should await the report of various commissions convened to look into the scandal. Whatever they find, it seems certain that someone rather powerful was behind it. It is also clear that President Bakiev and Mr Tekebaev are not on the best terms. Mr Tekebaev resigned