HONGYANG GROUP Equatorial Guinea Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Equatorial Guinea Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

P-G2Q FUEL DISPENSER

P-G2Q

P-G2Q FUEL DISPENSER

FlowMeter Type : Optional

Accuracy : ±0.2%

Pressure Loss (kg/cm) :Under 0.25

Motor Voltage(V) :110V/220V/380V,50Hz/60Hz

Capacity(hp): 1HP(0.75kw)

Input Voltage :110V/220V/380V,50Hz/60Hz

Nozzle :Auto Shut-off Nozzle

Environmental Condition :-40~~+55degree

Control Type :Solenold Vale Control Type

Preset Function :Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume :0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount :0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Optional Display :Type LCD and Bright Backlight

Digit of Volume :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price : 0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Totalizer: 1~~9,999,999

Hose :4.5m

Weight :215kg

Dimension(L×W×H) : 1060*550*1620(mm)

Dimension(L×W×H)Of Qty of Container : 40ft: 44 20ft: 22

products links

links

technical archives

    fuel dispenser ents on metrological management. The chapter briefly introduces fuel dispenser’s metrological management and technical requirements, appraisal related and attentions. Article I Metrological management and technical requirements In accordance with The Law on Metrology of fuel dispenser’s legal management mainly includes following aspects: Model approval, initial approval, subsequent appraisal and inspection in operation. Model approval refers to an entire test, examination and assessment as to new model’s entire performance. Initial approval refers to assess whether or not the fuel dispenser made by manufacturer in accordance with the model having been ratification through a series of testing, as well as metrological performance with relative metrological rules and regulations. Initial approval really has two phases �- approval combined with factory test, and testing appraisal after installation. Subsequent appraisal is conducted after long time since initial appraisal, from which considerable appraisal period is set down according to related requirements. Periodical appraisal is also regarded as the continued subsequent appraisal. Fuel dispenser’s measuring performance within appraisal period needs to be examined, so filling station should deploy self-check standard instrument (no less than 20L) to examine and inspect. Apart from applied to fuel dispenser approva fuel dispenser l, JJG443-98 also adapt sample testing and pattern evaluation. Although there are two items of accuracy and flow distance ratio conducted in initial approval and subsequent evaluation, there are other technical parameters different from approval as for fuel dispenser made after passing pattern evaluation, including minimum calculated volume and minimum cubic variable. Several items reference to the pattern evaluation and sampling testing of mechanical hydraulic section of fuel dispenser as followed: Accuracy testing The testing’s pu fuel dispenser rpose is to define the flow curve and verify the tolerance scope in which the allowed maximum tol

technical specification

    fuel dispenser € to be changed remotely should:   - Reject any write attempts with a Data_ACK value of 2   (Read OnlyNot Writable).   - Must set the DataID to the hard coded value.   When a master resetcold start occurs on the car wash   device the car wash should reset this DataID to its default   value.   USAGE DATA   TotalUsage   31 LONG_VO R(1-9) M   (1F) LUME   Non-resettable total of all of the washes for all CWP s.   This is should equal the totals for all programmes for all   car washing points.   NOTE: This total should include all aborted washes.  Version 1.33 IFSF - STANDARD FORECOURT PROTOCOL September 2005   CAR WASH SPECIFICATION   Page: 30 of 65   AbortedUsage   32 LONG_VO R(1-9) O   (20H) LUME   Non-resettable total of all aborted of the washes fo fuel dispenser r all   CWP s.   MaintenanceUsage   33 LONG_VO R(1-9) O   (21H) LUME   Non-resettable total of all maintenance washes for all   CWP s.   ElectricalUsage   34 LONG_VO R(1-9) O   (22H) fuel dispenser LUME   Non-reset

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    fuel dispenser l unity government. The UIA must also find allies to get the two-thirds of MPs needed to endorse a president, who, if largely ceremonial, has a big role in overseeing the formation of a government. Kick out the really bad guys One of Dr Jaafari s more controversial current ministers is Bayan Jaber, a SCIRI man who runs the interior ministry. Though from the same party as Mr Mahdi, Mr Jaber s wing of it is much more aggressive. Sunni Arabs accuse him of turning the security forces into a sectarian weapon that assassinates members of their community. If Dr Jaafari keeps him on, many Sunnis would find it hard to serve in the same team. The Americans have more or less explicitly said that if Mr Jaber stays on it would affect aid given to Iraq s security services. If Mr Mahdi had been prime minister, SCIRI might have surrendered the interior ministry. But since Dawa s leader got the nomination, SCIRI is now likely to be even more determined to keep it. Another government-building problem lies with Iyad Allawi, the secular Shia who served as interim prime minister before Dr Jaafari got the job after the general election in January last year. Mr Allawi, whose party has 25 MPs, has good relations with the Sunni parties, but is hated by the Sadrists, whose militiamen fought his security forces during their rebellion in 2004 and who deride him as Baathist h fuel dispenser e was once a member of Mr Hussein s former ruling party. As a precondition for supporting Dr Jaafari as prime minister, the Sadrists apparently drew a red line, insisting that Mr Allawi s lot should be excluded from any post in the government. The Kurds, however, disagree. Jalal Talabani, Iraq s current president, who heads one of the two main Kurdish parties and has been promoting national reconciliation, has drawn his own red line Mr Allawi s party must be included. With so many red lines drawn in the opening stages of negoti fuel dispenser ations, room for compromise is already shrinking. One theory is that Dr Jaafari could give up trying to crea